Service · Cloud Migration
Cloud migration services planned around your business calendar
We move servers, databases and applications to private, public or hybrid cloud in planned stages, with tested rollbacks and no surprises for the people who use them.
Our cloud migration services help organisations in Uzbekistan and Central Asia move from ageing server rooms to private, public or hybrid cloud without disrupting the people who depend on those systems. The target can be Caddy Cloud in-country, a public cloud, or both.
Successful migrations are mostly about preparation. We map what you run, who uses it and what it depends on, measure how much capacity it really needs and decide what to do with each workload. Some systems move as they are, some are rebuilt as managed services, and some turn out to be unused and can be switched off.
After the move, the platform needs to be watched and maintained. Our DevOps and monitoring team sets up observability and automation, and our managed IT and cybersecurity service covers patching, backups and access reviews.
The problem
Migrations fail on details, not on technology
Unknown dependencies
An accounting system talks to a forgotten file share, a licence server or a hard-coded IP address. Moving it breaks something nobody listed.Cost surprises
Workloads are moved as they are, and the first cloud bill is far higher than the old server room.Downtime at the wrong time
Cut-overs collide with month-end closing, a sales campaign or a production peak.
The solution
Cloud migration services with a plan for every workload
Discovery and dependency mapping
Agent-based and network discovery shows which systems talk to each other before anything moves.Target architecture
Landing zone, network, identity, backup and monitoring designed before the first workload arrives.Right-sizing and cost model
Workloads are sized on measured usage, with a monthly cost estimate per wave.Wave planning
Low-risk systems go first, critical ones go when the team and the platform have proven themselves.Rollback and validation
Every cut-over has acceptance tests and a rehearsed rollback path.
How we deliver
Migration in four stages
- 01
Discover
Inventory, dependencies, licences and performance baselines are collected.
- 02
Plan
Each workload gets a strategy, a target, a wave and an owner on your side.
- 03
Migrate
Waves are executed in agreed windows with testing by your users.
- 04
Optimise
After a stable month, sizing, backups and costs are reviewed and adjusted.
What you can check
Evidence at each stage
- Application and dependency inventory
- Target architecture and landing zone documentation
- Cost estimate per wave compared with actual spend
- Signed acceptance test results for every cut-over
- Post-migration review with optimisation actions
Technologies we work with
- Caddy Cloud
- AWS
- Microsoft Azure
- Google Cloud
- VMware
- Hyper-V
- Terraform
- Veeam
- PostgreSQL
FAQ
Frequently asked questions
Which clouds do you migrate to?
Caddy Cloud in Uzbekistan, the major public clouds, and hybrid setups that combine them. The target is chosen per workload.
Can we migrate without downtime?
Some workloads can move with near-zero downtime using replication. Others need a short window, which we schedule with you.
What about software licences?
Licences are reviewed during discovery. Some must be transferred or replaced, and we flag that early.
Do you migrate email and file shares?
Yes, including Microsoft 365 and Google Workspace migrations from on-premises servers.
Can our team do part of the work?
Yes. Many clients handle application testing or specific waves themselves, with our guidance.
Related products, services and industries
Caddy Cloud
Products
DevOps & Monitoring
Services
Cybersecurity & Managed IT
Services
Government
Industries
Healthcare
Industries
Corporate offices
Industries

Talk to an engineer about your project
Tell us what you run today and what has to change. We reply within one business day with next steps, not a sales script.
